I want to renovate an old house in stages, in which order should I do the work?

Author: admin  |  Category: Staging a House

i.e. should I do the plumbing first, the electrics, – how can I do the renovation in stages over a number of years?

First stage (usually the most expensive one) – make sure house is structurally sound (foundation, walls, etc) and repair any walls (plaster wise). At the same time install all the utilities, electrical, plumbing, cable, phone, etc. that you will need.

cover 3d small I want to renovate an old house in stages, in which order should I do the work?

Announcing *Home Staging Guide* - The Revolutionary New Home Staging Guide That Spotlights The Best Methods, and Opportunities You've Been Crying Out For - AND Delivers ALL The Information You Need To Stage Homes...

>> Click Here To Find Out More <<

Stage Two – Do roofing and windows

Stage Three – Paint the exterior of the house and do any repair work on siding

Stage Four – Landscaping

Stage Five – Interior decorating

This is very vague and the stages can change in depth and order depending on the need of the individual house. Do things a little bit at a time as you have the money. The first step is doing whatever you have to do to make the house suitable for you to live in. Good luck!

Related posts

3 Responses to “I want to renovate an old house in stages, in which order should I do the work?”

  1. waltonwayaugusta Says:

    ROOF
    TEAR OUT IF ELECTRIC IS BAD AND OUT DATED FROM CODE
    GO TO THIS OLD HOUSE THEY ARE ALLWAYS DOIN SOMTHIN CRAZY THERE
    BASICS FIND YOUR CODES FOR YOUR AREA AND ALL PERMITS REQUIRED TO DO THE WORK TO ORDINANCE
    References :

  2. doc_anne64 Says:

    well it depends is the house liveable and do you live in it? or plan to live there if the roof leaks id check on that and make sure that was fixed first for sure because if that leaks then you have a major problem of getting the floor ruined then i would check out the wiring and make sure it was ok and then go from there id do one room at a time because a bunch at one time can be expensive
    References :

  3. someone Says:

    First stage (usually the most expensive one) – make sure house is structurally sound (foundation, walls, etc) and repair any walls (plaster wise). At the same time install all the utilities, electrical, plumbing, cable, phone, etc. that you will need.

    Stage Two – Do roofing and windows

    Stage Three – Paint the exterior of the house and do any repair work on siding

    Stage Four – Landscaping

    Stage Five – Interior decorating

    This is very vague and the stages can change in depth and order depending on the need of the individual house. Do things a little bit at a time as you have the money. The first step is doing whatever you have to do to make the house suitable for you to live in. Good luck!
    References :
    Myself